4虎影院在线观看_手机免费av_4虎comwww最新免费地址_日漫黄色_欧美精品一级二级_亚洲成人福利

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

主站蜘蛛池模板: 日本激情在线观看 | 久草在线免费在线观看 | 999久久久91 黄色免费在线观看网站 | 日本网站在线观看一区二区三区 | 女人自慰片免费观看 | 亚洲乱仑 | 国产精品亚洲综合色区韩国 | 亚洲熟女色情网中文字幕 | 免费高清一区二区三区 | 91剧场在线观看 | 国产欧美一区二区白浆黑人 | 女人高潮一级一片 | 99精品热在线在线观看视频 | 日韩精品在线观看网站 | 亚洲理论av| 亚洲国产精品高清在线第1页 | 欧美日产一区 | 欧美日韩中文字幕一区二区高清 | 国产偷窥熟妇高潮呻吟 | 国产一区二区三区四区五区加勒比 | JIZZJIZZJIZZ少妇 | 亚洲午夜无码久久yy6080 | 理论片一级片 | 国产视频91在线 | 日本精品一区二区三区四区 | 色综合精品久久久久久久 | 日本肥熟 | 91免费| 91亚洲一区精品 | 亚洲欧洲日本无在线码天堂 | 蜜桃视频网站在线观看 | 日本一级待黄大片 | 国产亚洲精品AA片在线不卡 | 国产精品国产三级国产av品爱网 | 亚洲综合在线一区 | 日本精品在线播放 | 在线观看黄的网站 | ASSFREE疯狂老妇熟女 | 亚洲黄色av网站 | 97亚洲色欲色欲综合网 | 国产精品第一页爽爽影院 |